San Bruno B.A.R.T.

San Bruno Station


Home
Grade Separations
High Speed Rail
Tutor Punch List
SB Community
7th Avenue
Posy Parade
Mobility Problems
Caltrain News
Peaker Plant
Target Garage
TS/S Safety
BART 2 SFO
San Bruno Station
SSF Station
Millbrae Station
Links
SFO International
Aerial Pictures
Council Address
Sister City
About Us
Hear Me Out
Contact Us

News Reports

11/16/02 Wall divides Tanforan and BART
09/27/02 BART won't stop at 'Tanforan Park'
09/14/02 Underground training session planned for BART stations
02/18/02 Tanforan Mall finds itself in unique position
02/02/02 Fremont drafts visions for BART district
01/10/02 BART interested in anti-terror biological sensors.
2000 2001 2002 2003 2004 Show All


Photos

12/07/02 Feathered friends stop by to surveil airport stop.
12/07/02 Exposed tubular roof is defining design feature.
12/07/02 BART train testing will continue for at least ten weeks.
12/07/02 BART revenue operations begin January 2003.
12/07/02 BART gate machines were special order for SFO extension.
12/07/02 BART dignitaries open San Bruno station.
11/11/02 Target baskets already bang new BART walls.
11/11/02 BART fence looks like it was installed by a drunk.
10/04/02 No sooner is BART concrete poured that it is dug up.
09/14/02 Millbrae's extra equipment is carried on body board.
09/14/02 BART tunnel drill draws apparatus from six agencies.
09/14/02 BART rescue train waited in San Bruno to evacuate ''victims.''
08/31/02 Screens, panels, brackets, and towers
08/31/02 New Huntington Avenue has newer pothole.
08/31/02 Man carries youngster across sidewalk gravel.
08/31/02 Loose concrete splays above PD vehicular exit
08/31/02 For $1.5 billion you can't expect perfection.
08/31/02 Birds left permanent imprint on station
08/31/02 BART garage is completely awash with artificial light.
08/31/02 Aluminum foil remains; someone's leftover lunch maybe?
08/25/02 San Bruno's version of San Quentin prison.
08/25/02 Ronald Davis of Green Banker trashed at BART.
08/25/02 Fire exit has roll down door for security,
08/25/02 BART plaza appears enormous and empty.
08/06/02 Preplanning is watchword for Tutor-Saliba?
08/06/02 May BART’s arborist rest in eternal peace.
08/06/02 Gardco Lighting brightens BART station.
08/06/02 Cutler-Hammer cabinets could house homeless?
08/06/02 Consolidated Engineering Labs does the testing.
06/15/02 Police outhouse is located at back door.
06/15/02 BART's Black Bags Building Up.
06/15/02 BART station remains open on weekends.
06/15/02 BART lovers at heart have lots of room.
06/08/02 Platform awaits light at end of the tunnel.
06/08/02 BART garage looms over Sears Auto Center.
06/01/02 Workmanship is again typical Tutor-Saliba quality.
06/01/02 Ron Tutor's sidewalk does nothing for wheelchairs.
04/27/02 Unofficial tour begins of San Bruno BART station.
04/27/02 Tutor-Saliba design results in unique garage scenes.
04/27/02 Rebar is used to fasten panel to BART structure.
04/27/02 Plastic bubbles protect panel in transport.
04/27/02 BART wire is fed from large spools.
04/27/02 BART station artwork remains unhidden.
04/27/02 BART plaza to Tanforan and Police takes shape.
04/01/02 Workers are tethered to structure per OSHA.
04/01/02 Wood forms mark mistake being made to curb.
04/01/02 Separated tower will give ''Cape Kennedy feel.''
04/01/02 From Sears Auto Center ramp rises to BART garage.
03/24/02 Sears Auto Shop resembles flea market.
03/24/02 Samtrans will have several bus bays on ground level.
03/24/02 BART Police car will soon be parking in new garage.
03/23/02 Tutor-Saliba product leaves lots of doubt.
03/23/02 Plastic tarp allows rain to flow onto tracks.
03/23/02 Naughty pipe is control for fire hydrant.
03/23/02 BART guppies relax with television’s ''Charlie.''
03/17/02 Tutor-Saliba is creative making up for errors.
03/17/02 Station attendant's cubicle will be unwrapped.
03/09/02 Pigeons, BART go together like horse, carriage.
03/09/02 BART stairwell connects nothing to nothing.
03/09/02 BART inspector has good view of work.
03/09/02 BART fix made to enlarge weight-bearing column.
03/09/02 Artwork by Gordon Huether will fill BART space.
03/02/02 From Sears BART garage ramp gets formed in.
03/02/02 BART provides beautiful rays of sunlight.
02/22/02 Crooked wall got straight and narrow.
02/22/02 Apologies to Jackie Gleason.
02/22/02 ''I pronounce you Marklift and Grove.''
02/21/02 Paneling BART garage proceeds to Sneath.
02/21/02 Here’s a Tutor-Saliba joint to model.
02/21/02 BART's aerial activity provides juxtaposition.
02/21/02 BART construction mean concrete shoes.
02/16/02 Erosion reveals Tanforan's burger history.
02/09/02 Underground water continues to seep into BART.
02/09/02 Stepladders are belted to Link-Belt crane.
02/09/02 It is no wonder BART has graffiti in its tunnels.
02/09/02 BART ramp is seen from Sears Auto.
01/27/02 Straw donuts are used to protect the bay.
01/27/02 Duct tape can leave a bad impression.
01/18/02 In BART tunnels, water seeps onto tracks.
01/18/02 BART garage begins to dwarf Sears Auto.
01/18/02 Area will become plaza to BART trains.
1999 2000 2001 2002 2003 Show All